01 / 06Solar generation and site feasibility
First establish coordinates, expected consumption, shading, roof or land limitations, weather-series coverage and grid conditions. A solar resource model can provide an initial range of generation assumptions, but it does not replace equipment engineering, local structural verification, permitting or a confirmed connection offer. Compare model variants rather than treating one annual value as guaranteed production.
Useful evidence: PVGIS methodology, local meteorological observations, verified load shape, current grid operator requirements and original equipment specifications.
02 / 06Wind resources and production variability
National wind maps and broad reanalysis products are useful screening inputs, not a bankable energy-yield estimate. Examine hub height, terrain, roughness, turbulence, long-term variability, curtailment and the period on which a calculation depends. Any project-specific conclusion requires more detailed measurements, model validation and local approvals.
Useful evidence: dated metocean or meteorological series, site constraints, turbine technical limits, connection rules and independent feasibility methodology.
03 / 06Storage, flexibility and system value
Battery storage is not assessed by capacity alone. Determine charging and discharging profiles, usable energy, response time, degradation assumptions, round-trip efficiency, safety requirements and market access. Compare the physical requirement with the actual tariff or flexibility mechanism; a price chart by itself does not guarantee storage income.
Useful evidence: time-resolved consumption, generation patterns, documented operating modes, warranty conditions, safety standards and the applicable market design.
04 / 06Electricity networks and market context
Distinguish physical flows from commercial schedules, short-term prices from durable cost drivers, and national statistics from local network constraints. A transmission-system data series may describe a region's system, but it is not proof of available connection capacity at an address. Confirm current terms with the relevant operator before drawing conclusions.
Useful evidence: ENTSO-E methodology, local DSO or TSO publications, grid codes, tariff structures and the timestamp of any capacity statement.
05 / 06Industrial efficiency and heat
A credible efficiency case starts with a measured baseline and an explicit operational boundary. Record process temperatures, throughput, utilisation, occupancy, seasonal variation, maintenance constraints and fuel mix. Separate technical potential from operational adoption and from financial return; a brochure percentage is not a site-specific savings guarantee.
Useful evidence: metered interval data, equipment schedules, control logic, audited utility bills and a documented measurement-and-verification plan.
06 / 06Suppliers, procurement and responsible claims
Compare supplier declarations with independently traceable technical and legal records. Verify the product variant, test standard, warranty exclusions, maintenance service territory, cybersecurity where relevant, and lifecycle or emissions assertions. A catalogue badge, marketing case study or third-party logo alone does not establish certification or a commercial relationship.
Useful evidence: dated datasheets, test reports, legal registry records, supply terms, traceable declarations and explicit reuse permissions.